J&J Services
Storm drain and detention basin construction on a Utah development site

Heavy civil & site work

Stormwater & Drainage Contractor

Retention, detention, and conveyance systems that hold the water your permit says they will hold.

Detail

Stormwater is a permit condition before it is a construction problem. If the system does not perform to the approved drainage report, the project does not get signed off.

We build detention and retention to the design volume, install underground chamber systems where surface area is at a premium, and keep the SWPPP measures maintained through construction so a rain event does not turn into a violation.

On the Wasatch Front, spring runoff and high groundwater make drainage design unusually consequential. Getting it right the first time costs less than any of the alternatives.

Request a bid

Tell us about the site.

The more you can send — civil set, geotech, acreage, timeline — the tighter the number comes back.

We answer bid requests within one business day. Urgent? Call the office.